top of page

My most recent model of a public building, based on Bangor High. It includes the Gym, Peakes Auditorium, and the D wing of the school. Future additions will include the A and B wing sections.
-
Built in 2021-2022
-
3,550 pieces
-
28.5 x 24.6 x 3.7 in.
-
1:165 Scale
-
8.8 pounds

Bangor High School
By Beckett Mundell-Wood




bottom of page